The stages
Site works and foundations come first: demolition of anything on the site, earthworks, retaining, drainage and the slab. Then the frame, roof and cladding, which close the building in. Then the inside: insulation, linings, plumbing, electrical, kitchens, bathrooms, painting and floors. Then the outside: driveways, fences, landscaping. Then the council's final inspection, the code compliance certificate, and the title.
What slows a project
Ground conditions that need more retaining or piling than expected. Wet winters. Materials on long lead times. Changes required by the council during inspections. Subdivision sign off and title processing, which sit with the council and Land Information New Zealand and are not in the developer's hands. Each can add weeks.
What to expect from the developer
A programme at the start, and a revised programme whenever it changes. Progress photos. A straight answer to when it will be finished. We aim to tell buyers promptly when the estimate moves.
What to do while you wait
Keep your finance current, since a pre-approval lapses. Avoid new borrowing. Tell your lawyer and your bank when the estimated completion changes. If you are selling your current home, do not sell too early; a long settlement on your sale is one way to line the two up. See what is a long settlement.
Sources
- MBIE Building Performance: Get the build signed off
- settled.govt.nz: Buying a home
- The Law Association and REINZ: Agreement for Sale and Purchase of Real Estate, Eleventh Edition 2022 (4), sample
Checked October 2026. General information only, not legal, tax or financial advice.