Buying off the plans

What do I check at the pre-settlement inspection on a new home?

You are checking that the home matches the plans and specification and that everything works. Walk every room with the specification in your hand, test every tap, switch and door, note every mark and gap, and send the list to the developer in writing the same day. Settlement usually goes ahead; the fixes are done under the defects clause.

Powered by eXp New Zealand Licensed REAA 2008 From the first plans to the last key The New Build Report

Before you go

Take the plans, the specification and a phone for photos. Allow an hour. Go in daylight. Bring the person who will live there, and if you can, a builder or a building inspector. The agreement says when the inspection happens, usually in the settlement notice period.

What to check

Match the home to the specification: flooring, benchtops, tapware, appliances, paint, tiles, joinery. Open and close every window and door. Run every tap, flush every toilet, test the shower. Turn on the oven, the hob, the rangehood, the heat pump and the hot water. Check the power points and the lights. Look at the walls and ceilings for marks, cracks and uneven paint, and at the floors for scratches. Outside, check the fences, the paving, the letterbox, the clothesline, the gutters and downpipes, and the landscaping against the plan.

How to record it

Write a list, room by room, with photos. Send it to the developer and copy your lawyer the same day. The developer will tell you which items will be fixed before settlement and which fall under the defects period.

What the developer has to fix

Anything that does not match the agreement, does not work, or is defective. Minor cosmetic marks are usually fixed in the defects period rather than holding up settlement. A missing or materially different item is a different matter, and your lawyer can raise it before settlement. The home must still have its code compliance certificate; the inspection does not replace that.

After settlement

Keep your list. Anything that shows up in the first year, such as a door that sticks as the timber settles or a hairline crack in the plaster, goes to the developer in writing as you find it. The Building Act gives you twelve months from completion to notify defects, and the developer must then fix them within a reasonable time.

Sources

  1. MBIE Building Performance: Know your rights, a quick guide for homeowners
  2. MBIE Building Performance: Implied warranties and defects
  3. settled.govt.nz: Settlement checklist for buyers

Checked October 2026. General information only, not legal, tax or financial advice.

Kingdom Realty

From the first plans to the last key.

Talk to us

Ready to talk?

Tell us whether you're buying or selling a development, and we'll call you within one working day.

The form takes two minutes. A real person calls within one working day, and nothing is signed until you choose to.

Prefer to talk? +64 9 802 7695 or hello@kingdomrealty.co.nz.

Add a note

We use your details to answer this and follow it up, and keep them in our client records. We never sell them. Privacy policy.

Prefer to talk? Call +64 9 802 7695 or email hello@kingdomrealty.co.nz.

The New Build Report

Thanks, you're on the list.

You'll receive the next issue as soon as it's out. Here's the current one to read now.